IntelliFabric
← Solutions/Manufacturing
INDUSTRY SOLUTION

From shop floor to top floor  in real time.

Your ERP knows production. Your MES knows downtime. Your quality system knows defects. But no one knows the full picture until it's Friday morning and the numbers are already wrong.

IntelliFabric connects every system in your plant into a single intelligence layer — OEE, throughput, quality, and cost, live and reconciled.

23%
Avg OEE improvement
60%
Reporting effort cut
4 wks
Typical go-live
app.intellifabric.com / manufacturing / plant-overview● LIVE
Plant OEE
87.4%
+3.2%
Throughput
1,168/hr
+12% vs plan
Active Downtime
4.2 hrs
−18% MTD
Quality Rate
99.1%
+0.4pp
Line A — Assembly
91%
Line B — Machining
84%
Line C — Packaging
76%
Line D — Welding
94%
Line C: Scheduled maintenance overdue — 2.4h delay
Line B: Throughput below target by 8% this shift
JanJunDec
Scrap Rate1.2%
Labor Productivity94.3%
Inventory Turns11.4×

What's breaking before IntelliFabric.

Every manufacturingoperation we talk to faces the same six problems. If these sound familiar, you're not alone.

OEE is a spreadsheet, not a dashboard

Shift supervisors manually compile OEE from three systems every morning. By the time the number is clean, the shift that caused it is already over.

IntelliFabric calculates OEE live from your MES and historian — updated every 15 minutes and visible to every supervisor before the shift ends.

Downtime causes are invisible until it's too late

Unplanned stoppages get logged — but not analyzed. Root cause review happens in the next week's meeting, not in the next five minutes.

Downtime events are tagged, categorized, and ranked by total production impact in real time — root cause is visible in minutes, not next week's meeting.

Quality escapes reach the customer

First-pass yield data sits in the quality system. It doesn't reach production managers until a customer complaint forces a full trace. By then, the cost is already real.

First-pass yield connects directly to production dashboards. Quality managers see defect trends by line and shift without waiting for a system export.

Production vs plan gaps go unnoticed

Planned vs actual output is compared at end of day or end of week. Mid-shift course correction is impossible because no one has the number.

Planned vs actual output is compared every 15 minutes — mid-shift corrections happen while there's still time to close the gap.

Inventory and production aren't connected

Purchasing doesn't know current WIP levels. Production doesn't see incoming material delays. Shortages are discovered at the line, not in planning.

WIP levels and incoming material delays surface in the same production view as scheduling — shortages become visible in planning, not at the line.

Leadership sees last month, not today

Executive reports are built manually from ERP extracts. The board sees a 30-day lag on the most important operational metrics in the business.

Executive dashboards pull directly from the live data model. Leadership sees today's numbers — not last month's report.

Every metric your team needs  pre-built.

These KPIs ship with IntelliFabric for Manufacturing. No custom build required — they arrive encoded with your data on day one.

Production
01
Overall Equipment Effectiveness (OEE)
Availability × Performance × Quality, by line and shift
02
Production Throughput
Units produced per hour vs planned rate
03
Planned vs Actual Output
Real-time gap between schedule and actuals
04
Cycle Time vs Standard
Actual vs engineered cycle time per operation
Downtime
05
Downtime by Category
Breakdown, changeover, shortage — with root cause tags
06
Machine Utilization
Productive vs idle vs planned downtime per asset
Quality
07
First-Pass Quality Rate
Defect-free units as a percentage of total produced
08
Scrap Rate by SKU
Waste units per run, compared to standard
Assets
09
Maintenance Cost per Asset
Corrective vs preventive maintenance ratio and cost
10
Energy Consumption per Unit
kWh/unit by line, shift, and SKU family
Labor & Cost
11
Labor Productivity
Units per labor-hour by cell and shift
12
Inventory Turns
Raw material, WIP, and finished goods turns by category

Built for Manufacturing.
Not adapted from something else.

Generic BI tools can be configured for any industry. IntelliFabric ships with manufacturing logic already encoded — data models, KPI definitions, and integration connectors specific to your operations.

OEE calculated live — not in the morning debrief

We encode A×P×Q with your exact shift definitions, downtime categories, and line hierarchies. OEE updates every 15 minutes from your MES and historian — not recalculated at shift end.

ERP, MES, and historian joined automatically

We've built the connectors between SAP, Rockwell FactoryTalk, and OSIsoft PI before. Your production, downtime, and quality data land in one intelligence layer — no custom ETL to maintain.

Plant, line, and machine — all three levels out of the box

Navigate from enterprise OEE summary to an individual machine in three clicks. The drill-down hierarchy ships with IntelliFabric — not as a follow-on customization project.

Role-based access by plant, shift, and function

Shift supervisors see their line. Plant managers see their facility. Executives see the consolidated view. Access is configured at go-live — not after your IT team raises a ticket.

Connects to every system you already run.

No rip-and-replace. IntelliFabric ingests from your existing stack using pre-built connectors and Microsoft Fabric data pipelines.

ERP
SAP ERP
ORC
Oracle Manufacturing
IN
Infor M3
MES
AV
AVEVA MES
Rockwell FactoryTalk
Siemens Opcenter
Data & Connectivity
PI
OSIsoft PI
Azure
SQL Server
Azure
Excel / CSV
REST APIs

+ Any REST API, SFTP feed, or custom source — via Microsoft Fabric Data Factory connectors.

From kickoff to live in 4–6 weeks.

1
Week 1–2
Connect & Ingest
  • ERP and MES connectors configured
  • Historian and SCADA data ingested
  • Data quality baseline established
  • OneLake Lakehouse provisioned
2
Week 3
Model & Enrich
  • Unified production data model built
  • KPI definitions encoded (OEE, FPY, etc.)
  • Shift and line hierarchies configured
  • Business rules and exception logic set
3
Week 4–5
Build & Configure
  • Plant overview dashboard deployed
  • Line-level OEE dashboards live
  • Quality and downtime drill-downs active
  • Role-based access by plant / function
4
Week 6
Train & Go Live
  • Shift supervisor onboarding
  • Operations manager training
  • Executive dashboard sign-off
  • Handover and managed service begins

What clients actually achieve.

0%

Average OEE improvement

Across manufacturing clients in Year 1 after go-live

0%

Reporting effort cut

Daily production reports generated automatically, not manually

0 wks

Time to first live dashboard

ERP + MES + quality systems connected and reconciled

We went from a two-day reporting cycle to live dashboards in our first four weeks. Our ops team stopped emailing Excel files entirely. The shift was immediate.

S
Sarah Al-Rashid
VP Operations, Superior Farms

See IntelliFabric for Manufacturing.

Book a 30-minute demo and we'll walk you through exactly how IntelliFabric would work with your data and systems.